Quality Mableton GA septic system installers do a great deal of examination, long before a unit gets put into the ground. A brand new unit will last many years, and possibly even generations, if it’s installed the right way, but it can fall short right away if it’s not. Additionally, all Mableton GA septic system installers must secure a permit for them to execute the install, and may need to collaborate with city or county officials to show that particular tests were run in order to move on. These three evaluations are vital initial steps that should always be taken before any task or designs are done, and it may also be advantageous to accomplish them before you buy a property, so you can be assured that a tank and leach field will be allowed.
1. Pit
The pit test is quite uncomplicated. During the course of this test, a hole is dug and the soil is examined to figure out its structure. A typical leach field is reliant on the soil’s structure to drain successfully. If there is a bunch of gravel or sand, your leach field should be capable to discharge the effluent (water) from the tank well, where the soil will finish cleaning it. If the soil has a bunch of clay or rock, it won’t drain well, and so a standard leach field will not be an alternative. If the location you’ve chosen does not successfully pass the pit test, you may be able to choose another site on your property or use an alternate type of drain field, like a mound system.
2. Perc
The perc, or percolation test, consists of excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then saturating it with water. The hole is commonly left soaked for about two hours, and refilled as needed. Then, the hole is filled with 6 inches of water and monitored for water drainage.
3. Visual
There are many things an inspector will look into visually. Many units are gravity-fed, so they don’t depend on electricity or pumps to transfer effluent from the tank to the leach field. Because of this, the slope of the ground is essential. An inspector will also seek out slopes that could possibly feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Choose Quality Mableton GA Septic System Installers Now
Selecting the right layout, kind of system, and evaluating the land effectively, are all fundamental steps in making sure an install goes off without a hitch. Most importantly, these steps ensure that the install is done properly, so that a system provides decades of use without issue. If you’re prepping for an install, call Atlanta Septic Tank Pros. Our professionals are skilled and dedicated to quality, so you can be sure the job is done right. Call (404) 998-8812 today.