Quality Morrow GA septic system installers do a lot of legwork, long before a unit gets installed into the ground. A new unit will last many years, and possibly even generations, if it’s set up correctly, but it can break down instantaneously if it’s not. On top of that, all Morrow GA septic system installers must acquire a permit for them to carry out the install, and may ought to partner with city or county officials to show that certain tests were performed in order to progress. These three tests are important initial steps that should always be taken before any job or designs are done, and it may also be beneficial to do them before you purchase a property, so you can be assured that a tank and leach field will be allowed.
1. Pit
The pit test is relatively straightforward. During this test, a hole is dug down and the soil is analyzed to figure out its composition. A typical leach field is reliant on the soil’s structure to drain successfully. If there is a considerable amount of gravel or sand, your leach field should be ready to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a lot of clay or rock, it won’t sink well, and so a traditional leach field will not be an option. If the site you’ve picked does not successfully pass the pit test, you may be able to choose another site on your property or use an alternate kind of drain field, like a mound system.
2. Perc
The perc, or percolation test, requires digging a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is commonly left drenched for about two hours, and refilled as needed. After this, the hole is filled with 6 inches of water and monitored for water drainage.
3. Visual
There are many things an inspector will check visually. Many units are gravity-fed, so they don’t depend on electricity or pumps to move effluent from the tank to the leach field. Because of this, the slope of the ground is important. An inspector will also look for inclines that could feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Enlist the Services of Quality Morrow GA Septic System Installers Today
Selecting the right layout, type of system, and assessing the land correctly, are all essential procedures in making sure an install goes off without a hitch. Most importantly, these steps ensure that the install is done properly, so that a system provides years of use without issue. If you’re prepping for an install, contact Atlanta Septic Tank Pros. Our specialists are experienced and committed to quality, so you could be sure the job is done right. Call (404) 998-8812 now.