Quality Sunny Side GA septic system installers do a number of legwork, long before a unit gets put into the ground. A brand new unit will last decades, and possibly even generations, if it’s installed the right way, but it can break down instantaneously if it’s not. On top of that, all Sunny Side GA septic system installers must acquire a permit in order to execute the install, and may need to work with city or county officials to show that particular tests were done in order to proceed. These three assessments are important primary steps that should always be taken before any work or designs are done, and it may also be advantageous to do them before you acquire a property, so you can be assured that a tank and leach field will be allowed.
1. Pit
The pit test is relatively straightforward. During the course of this test, a hole is dug down and the soil is inspected to establish its composition. A typical leach field is reliant on the soil’s composition to drain successfully. If there is a considerable amount of gravel or sand, your leach field should be able to discharge the effluent (water) from the tank well, where the soil will finish cleaning it. If the soil has a bunch of clay or rock, it won’t drain well, and so a standard leach field will not be an option. If the location you’ve picked does not successfully pass the pit test, you may be able to choose another site on your property or use an alternate kind of drain field, like a mound system.
2. Perc
The perc, or percolation test, requires excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then filling it with water. The hole is normally left soaked for about two hours, and refilled as needed. Then, the hole is filled with 6 inches of water and monitored for drainage.
3. Visual
There are numerous things an inspector will look into visually. Most units are gravity-fed, so they don’t rely on electricity or pumps to shift effluent from the tank to the leach field. Because of this, the incline of the ground is vital. An inspector will also try to find slopes that could feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Choose Quality Sunny Side GA Septic System Installers Today
Selecting the right design, type of system, and evaluating the land properly, are all essential steps in making sure an install goes off without a hitch. Most significantly, these steps guarantee that the install is done correctly, so that a system provides many years of use without issue. If you’re prepping for an install, call Atlanta Septic Tank Pros. Our technicians are knowledgeable and devoted to quality, so you could be sure the job is done right. Call (404) 998-8812 today.